#地點(diǎn):廣東江門(mén)
#到崗:5月12日
#周期:3個(gè)月
#英語(yǔ):聽(tīng)說(shuō)讀寫(xiě)熟練
要求:
1.Check the saturations and packaging ofthe bundles before the release ofthePLS
2.Verify the flow ofPLs released (in bundle) VS skid saturation
3.Weekly Container Scheduling Control Vs Containers Actually Loaded
4.container loading control with particular attention to the lashing and securingofthe loaded skids according to procedures shared between the TCM Vendorand Cosco.