1. Participate in the installation and commissioning phase of project facilities.
2. Understand the electrical drawing and PLC(SIEMENS/ Mitsubishi)
3. Responsible for internal and external technical communication for the later maintenance of the facility equipment.
4. Coordinate technical issues in project implementation, guide installation, commissioning and delivery.
5. Deal with the electrical problems in public and auxiliary facilities.
6. Be part of projects with requirements on upgrade on existing automation or installation of new automation.
7. Participate in the preparation of preventive maintenance plans for the automation part of the equipment.
8. Perform corrective maintenance when necessary.
9. Act proactively in safety activities. Identify, report and record safety risks such as accidents, unsafe conditions, unsafe acts, etc.
10. Perform risk analysis before starting an activity.
11. Perform the activities always focusing on the availability of the equipment and identify deviations in components.
12. Search for self-development and ask for leadership help when necessary.
1. 參與項(xiàng)目設(shè)施的安裝和調(diào)試階段。
2. 了解電氣圖紙和PLC(西門子/三菱)
3. 負(fù)責(zé)設(shè)施設(shè)備后期維護(hù)的內(nèi)外部技術(shù)溝通。
4. 協(xié)調(diào)項(xiàng)目實(shí)施中的技術(shù)問題,指導(dǎo)安裝、調(diào)試和交付。
5. 處理公共及輔助設(shè)施的用電問題。
6. 參與需要升級現(xiàn)有自動化或安裝新自動化的項(xiàng)目。
7. 參與編制設(shè)備自動化部分的預(yù)防性維護(hù)計(jì)劃。
8. 必要時執(zhí)行糾正性維護(hù)。
9. 積極主動地開展安全活動。識別、報告和記錄安全風(fēng)險,如事故、不安全條件、不安全行為等。
10. 在開始活動之前執(zhí)行風(fēng)險分析。
11. 執(zhí)行活動,始終關(guān)注設(shè)備的可用性并識別組件中的偏差。
12. 尋求自我發(fā)展,并在必要時尋求領(lǐng)導(dǎo)幫助。